2018

-2020

Sepehr-Jufair Integrated Field Development Project

Project Sector(s)Oil & Gas UpstreamStart Date2018
Contract TypeEngineering (E)End Date2020
Client NamePasargad Energy Development Group

Development of Sepehr-Jufair Field in 3 Phases for achieving production of 110,000 Barrel of oil per Day

Region/Field Description:

Sepehr- Jufair Integrated Field Development Project contract was signed between NIOC and Pasargad Energy Development Company in March 2018. The project was then assigned to Pasargad Exploration, Development and Production Company.
Hirbodan will act as technical services assistant for surface facilities.

Scope of Services:

1- Conceptual Design (completed)
2- Detailed Design of 3 well pads, related access roads and camp (ongoing)
3- Preparation of Tender Documents for FEED, Post FEED and EPC Site Supervision Tender (completed)
4- Preparation of Tender Documents for Geotechnical Investigations
5- Preparation of Topography Scope of Works
6- Preparation of Hydrology Scope of Works

Project Nature:

E&P , Field Development

Project Goals:

– Achieving 36,0000 Bbl/Day in Phase 1
– Achieving 110,0000 Bbl/Day in Phase 2
– EOR/IOR in Phase 3

Project Unit(s) or Section(s):

1- Subsurface Studies
2- Drilling
3- Surface Facilities