“Shiraz Oil Refining Company” (SORC) was designed and constructed for a nominal processing capacity of 40,000 BPSD in 1973 and then expanded to 60,000 BPSD.
As part of this project, SORC intends to implement a new 26,000 BPSD Distillate Hydro-Treating Unit (DHT) and all required process units (Sulfur Recovery Complex and Hydrogen Production Unit) along with utilities and off-site facilities in Shiraz Oil Refinery (SOR) in line with local and international environmental standards in order to reduce the Sulfur content of Gasoil product to meet Euro 5 specifications.
On the other hand, SORC intends to implement a new Naphtha Splitter with the capacity of 6500 BPSD and a new Isomerization Unit with the capacity of 5000 BPSD in SOR. The purpose of the Naphtha Splitter is to separate light Naphtha from hydrotreated Naphtha in order to feed to the Isomerization unit. The objective of the Isomerization unit is to produce Isomerate with the RON of 88 as a minimum.
Scope of Services
1- General Consultancy of the Project
2- Management Consultancy of the Project
3- Consultancy and Observation in CONTRACT affairs.
4- Control and Checking of Sub-Contractors and Vendors’ …
5- Project Control and Programming Services
6- Engineering Services
7- Procurement Services
8- Construction and Erection services
9- Observation of Quality Control, Quality Assurance, Technical Inspection and HSE
10- Pre Commissioning, Commissioning, Operation, Hand-Over of the Project to the Final Operator Services
11- Anticipate, Control and Approval of Invoices
12- Management of Human Resources
13- Information Technology and Document Transmittal Automation System Services
14- Health, Safety and Environment Services
15- Reporting Services
16- Goods Transport Services