Part of the 6th gas network injection pipeline in the regions of Koohdasht-Charmaleh and Dezfool-Koohdasht was fulfilled since the beginning up to 131 Km on 25, December,2017 at 9Am. Further, Dezfool-Koohdasht region at the length of 164 Km will be fed with gas till tomorrow.
It means that about 500KM out of the total 590KM gas export pipeline project (part of the 6th gas network) has been filled up with gas up to now